Stage of production

Processing stage of the order that is entered in progress:

- engineering order processing;
- coordination with the Consumer the detail questions of the delivery;
- supporting of the completeness of set and delivery period;
- product manufacture;
- complex test of the product to the efficiency and conformity;
- accomplishment of all hauling operations;
- authoring of full set of the transport documents.

Conventional implementation phase of the project:

1. Front end engineering design. All equipment for the designed networks is shaped out with account taken of special factors relating to premises and Customer’s request.
During front end engineering design is carried out the expertise of the operating installations, is discussed the appeared Consumer’s aims, is materialized the filling of the report form with the necessary electric installation completing definition. At that is carried out the qualified consultative and informational support followed by the commercial offer which includes the variants of the engineering decisions, terms and estimated cost of the project implementation.

2. Conclusion of a contract between the producer factory and Consumer.
If the proposed engineering decisions, terms and cost of the project implementation are conformed to the requirements of the Consumer, the Parties sign a contract which specifies all attained agreements.

3. Designing:
- drafting of the performance specification;
- development of the approval package and working documentation of RP and ID stage;
- its agreement and confirmation by the Consumer;
- confirmation of the project with regulatory authorities (as available).
Network engineering of the power equipment electric supply, electric lighting and grounding is performed according to the legislative and normative-technical international documents and document of Ukraine and construction standards.

4. Complement and production.
According to the approved project and schedule chart the integrated support of the project by all required supplies and materials is carried out.

5. Conduction of the building, wiring and precommissioning includes:
- construction works;
- assembling of the technologic and electric equipment;
- precommissioning;
- testing of the internal circuits of the electric lighting and power equipment;
- internal electric equipment (electric lighting and power equipment).

6. Plant handover for commissioning.
Consumer’s examination of the quality, fullness of the performed work and equipment start-up.